Nor-lake Lighted Chambers Manual de usuario

Busca en linea o descarga Manual de usuario para Refrigeradores Nor-lake Lighted Chambers. Nor-Lake Lighted Chambers User Manual Manual de usuario

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 12
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 0
06/11 Rev. A 147286
LIGHTED CHAMBERS
Installation, Operation and
Maintenance Instructions
GENERAL
2
Inspection
2
Location
2
Installation
3
Door Alignment 3
Shelf Installation 4
Remote Contacts 4
RS485 Port (optional) 4
Internal Outlet (optional) 4
Access Port (optional) 4
Humidity Installation (optional)
5
Drain Installation
5
Electrical
6
Glycerin Well Assembly
6
OPERATION
6
MAINTENANCE
7
Periodic Cleaning
7
Cleaning the Humidifier
7
Battery, fuse, bulbs and lighting levels
Trouble shooting guide
9
11
Wiring Diagram
12
Vista de pagina 0
1 2 3 4 5 6 ... 11 12

Indice de contenidos

Pagina 1 - Maintenance Instructions

06/11 Rev. A 147286 LIGHTED CHAMBERS Installation, Operation and Maintenance Instructions GENERAL 2 Inspection 2 Location 2 Installation 3

Pagina 2 - GENERAL

- 10 - Lamp replacement: For your safety, turn off cabinet during re-lamping. NOTE: Light output is dependent upon re-lamping with same type b

Pagina 3 - - 3

- 11 - MAINTENANCE SERVICE AND ANALYSIS GUIDE MALFUNCTION POSSIBLE CAUSE SOLUTION Compressor will not start - 1. Service cord unplugged 1.

Pagina 4 - - 4

- 12 - 1254TEMP PROBE

Pagina 5 - - 5

- 2 - GENERAL INTENDED USE Designed to meet the demanding requirements for scientific and laboratory research. Advanced engineered design incor

Pagina 6 - - 6

- 3 - INSTALLATION Door Alignment - If for some reason the doors are not squared up on the cabinet, the doors can be adjusted. Opening the door

Pagina 7 - MAINTENANCE

- 4 - Shelving Installation – Shelving and Lighting comes installed for your desired light option. To change shelf locations disengage lock as

Pagina 8 -

- 5 - HUMIDITY INSTALLATION (if applicable) The water supply should have a dedicated shutoff valve and regulator installed. Connect the water

Pagina 9 - - 9

- 6 - ELECTRICAL For electrical requirements see data information and wiring unit diagram located in parts bag, inside of the cabinet. Chec

Pagina 10 - - 10

- 7 - Note: The cabinets are equipped with two switches located on the façade. One is the main power ON/OFF switch for the unit. The other is a

Pagina 11 - - 11

- 8 - Figure B Figure C Figure D

Pagina 12 - - 12

- 9 - 3. Lift out the Atomizing Unit that rests freely on the Reservoir. 4. Clean the Atomizing Unit. Do not submerge in water. a. Slightly

Comentarios a estos manuales

Sin comentarios