06/11 Rev. A 147286 LIGHTED CHAMBERS Installation, Operation and Maintenance Instructions GENERAL 2 Inspection 2 Location 2 Installation 3
- 10 - Lamp replacement: For your safety, turn off cabinet during re-lamping. NOTE: Light output is dependent upon re-lamping with same type b
- 11 - MAINTENANCE SERVICE AND ANALYSIS GUIDE MALFUNCTION POSSIBLE CAUSE SOLUTION Compressor will not start - 1. Service cord unplugged 1.
- 12 - 1254TEMP PROBE
- 2 - GENERAL INTENDED USE Designed to meet the demanding requirements for scientific and laboratory research. Advanced engineered design incor
- 3 - INSTALLATION Door Alignment - If for some reason the doors are not squared up on the cabinet, the doors can be adjusted. Opening the door
- 4 - Shelving Installation – Shelving and Lighting comes installed for your desired light option. To change shelf locations disengage lock as
- 5 - HUMIDITY INSTALLATION (if applicable) The water supply should have a dedicated shutoff valve and regulator installed. Connect the water
- 6 - ELECTRICAL For electrical requirements see data information and wiring unit diagram located in parts bag, inside of the cabinet. Chec
- 7 - Note: The cabinets are equipped with two switches located on the façade. One is the main power ON/OFF switch for the unit. The other is a
- 8 - Figure B Figure C Figure D
- 9 - 3. Lift out the Atomizing Unit that rests freely on the Reservoir. 4. Clean the Atomizing Unit. Do not submerge in water. a. Slightly
Comentarios a estos manuales